Project Limits:
The roadway approaches encompass approximately one mile on both sides of the Indian River Inlet Bridge along Route 1 in Sussex County. Project Need: This project will meet the need for newly realigned roadway approaches to be built on both sides of the new Indian River Inlet Bridge. Once the new bridge is completed, this same contract will permit the removal of the entire existing bridge including the bridge piers within the inlet. Current Construction Dates The 740-calendar day project is expected to begin March 2011 and be completed in 2013. Contractor and Cost George & Lynch, Inc. - $11,625,940 Construction Schedule Phase I: March to May 2011 - Construction of temporary crossovers in preparation for a new traffic pattern in the area of the bridge. Minimal traffic restrictions and disruptions as the contractor mobilizes to the site and begins work. Phase II: May to December 2011 - By Memorial Day 2011, a new traffic pattern will be in place. During this phase, the contractor will be constructing the roadway approaches to the new bridge structure. Phase III: December 2011 to Mid-2012 - During this time, the contractor will complete permanent access roadways to the park under the bridge, restore other local roadway connections and construct turn lanes. This phase also includes the demolition of the existing Indian River Inlet Bridge. The existing bridge will be disassembled using jackhammers and other heavy equipment, and will the concrete and pier portions will be transported and deposited to a reef site. Structural steel from the bridge will either be transported to the reef site or recycled by the contractor. |
|